Cross-Project Coverage View

What it provides
A dedicated page that shows coverage for a whole set of work items at once. Choose a saved query and see an overall result, your team's secondary metrics, and the full work item hierarchy with coverage for each item.
Why it matters
It gives leads and managers a single view of quality across a release, a team, or an area, with no need to open work items one by one. Because it uses the saved queries your team already maintains, it adapts to however you organize your work.
When to use it
Release readiness reviews: is everything planned for this release tested well enough?
Sprint and status meetings: see which Epics or Features need attention.
Comparing areas: spot which part of the hierarchy is weakest.
Reporting: download the data for reviews and stakeholder updates.
Example
Before a release review, an engineering manager selects the "Release 5.2" query. The summary bar is orange. She expands the red Epics, finds the stories with the lowest coverage, turns on the Non-Unit Tests column to see which items are weak beyond unit testing, and downloads the CSV for the meeting.
Understanding the data
Opening the page
In your ADO project, select Coverage Analysis in the left-hand project navigation.
Choosing a query
Everything on the page is based on the saved query you select at the top. The list contains only the queries you have permission to view, and starts with "All work items in this project". The page remembers your last selection, so the query is already chosen the next time you visit.
You only see work items you have access to in ADO.
The overall result
At the top, the summary bar shows the combined coverage for all work items in the report: the percentage, how many modified methods are covered out of the total, and how many are uncovered. It uses the same colors as the work item panel, based on your project's thresholds, and the threshold is shown under the bar.
Below it, metric tags show your team's secondary metrics (for example, Unit Tests or Non-Unit Tests) across the same set of work items.
The work item table
The table shows the work items returned by the query as a hierarchy. The highest level found in the results is the top of the tree. For example, if the query returns Epics and User Stories, Epics are at the top and their stories expand beneath them.
The item count appears above the table. For each work item you see its ID and title (linked to the work item), assignee, priority, status, and its coverage as a colored bar and percentage. You can sort by any of these columns.
N/A means there's nothing to measure: no code has been reported yet for the item or its children.
A "Data as of" timestamp at the bottom right shows when the data was last updated.
Adding columns
Use Columns to add a column for any secondary metric defined in the project settings. This lets you compare, for example, overall coverage with unit test coverage across every work item in the hierarchy.
Exporting
Download CSV exports the table as you see it, including the hierarchy and all visible columns.
Full Analysis
Each row has a Full Analysis button that opens the detailed analysis for that work item: which child items, test stages, and methods are behind its coverage. See Work Item Full Coverage Analysis.
Last updated